the question
Bouwinvest Real Estate Investors commissioned Boltt to combine two retail properties at Lijnbaan 101–105 and 111 in Rotterdam into what was to become Nike’s largest store in Europe. This also created an immediate opportunity to improve the building’s sustainability performance.
Because Nike was aiming to open in early 2025, the project was subject to a tight schedule. This required an efficient permitting process and careful construction planning, with early attention to the most effective overall approach.
During both the design and construction phases, Boltt also acted as a sounding board for construction management firm Bouwplot and produced a series of visualisations for Nike.
the approach

Lijnbaan 101–111, originally designed by Krijgsman and Van Duin Architects and completed in 1967, has been renovated several times over the years. In 1998, D&T van Manen Architects carried out a renovation in which two large Octatube curtain-wall facades were added.
Boltt asked Octatube to investigate whether the single glazing in these facades could be replaced with more sustainable alternatives. For Octatube, which is increasingly involved in this kind of sustainability challenge, this formed a relevant part of the project. Octatube subsequently contributed to the engineering. The facade of the left-hand section, designed by Mei architects and planners, was completed in the summer of 2023.
Together with project manager Bouwplot, Boltt developed an action plan to improve the sustainability of the two buildings and merge them into a single retail environment. In a series of short, focused sprints, the existing condition, the documents for the environmental permit application and the construction drawings were worked out in parallel.
Using archival drawings, Boltt incorporated the existing condition into a BIM model, which also formed the basis for the environmental permit application. This integrated model also included Nike’s requirements. The partition walls between the two buildings were removed, a new customer staircase and elevator shaft were introduced, a new storage area was added, and the entrance was moved from Lijnbaan 111 to Lijnbaan 105.
Boltt also prepared the construction drawings for contractor J.P. van Eesteren. PelserHartman first produced a point cloud of the existing condition, which Boltt then processed and integrated into the BIM model together with the suppliers’ models. Boltt also coordinated the process as a whole.


“I greatly enjoyed working on the merger of two buildings on the Lijnbaan in Rotterdam. In collaboration with Nike, the contractor and the consultants, we redesigned the base and shell of the building. It was rewarding to help create a more sustainable space aligned with Nike’s vision.”
Kübra Kaçar, Technical Designer
The result
Within a short timeframe, Boltt combined two retail properties into what became Europe’s largest Nike store on the Lijnbaan in Rotterdam. Acting between Bouwinvest, Nike, and J.P. van Eesteren, Boltt coordinated the sustainability measures, design requirements, and construction process. With renovated facades, solar panels, and upgraded glazing in the Octatube curtain walls, the store was completed at the end of 2024, a more future-proof building and a new addition to the Lijnbaan.
client
Bouwinvest
year
2024
services
BIM Coordination
BIM Implementation
Image
Visualizations: Boltt
Photos: Kees Hummel
Collaboration
Building Lot, DGMR, J.P. van Eesteren, Octatube, Pieters Bouwtechniek
Collaborating and working together.
Within the same process and toward the same goal.
Step by step… carefully… passionately…
Space for each other and for personal growth.
But always together. Solid = solid!
That’s BOLTT.
Want to make your building future-proof too?
We advise on sustainability measures and the BIM approach best suited to your project and requirements.
Call Jurriën at 06 – 14 85 35 74
Or feel free to email jurrien@boltt.nu

More work we're proud of at
{"post_type":"case","posts_per_page":"4","post_status":"publish","ignore_sticky_posts":true,"order":"DESC","orderby":"date","s":"","tax_query":[{"taxonomy":"service","field":"term_id","terms":[3,4,6,5]}],"post__not_in":[1506]}